T&T Turnov

29. 04. 2026

Hot-end Audit: What We Inspect and Measure

A structured hot-end audit covers 24 inspection points across the feeder, IS machine, conveyor and lehr. Here is exactly what our engineers measure: gob weight consistency, blank-side temperature profiles, cooling air flow rates, servo cycle times and lehr belt speed accuracy.