T&T Turnov

Thermal Processing

Annealing Lehr

The Annealing Lehr ensures controlled gradual cooling of glass products. It eliminates internal stress in the glass, ensuring the strength and durability of the final bottles and containers.

Annealing Lehr

Parameters

Max. temp.: 600 °C

Heating: Gas / El. / H₂

Technical Specifications

Thermal Parameters

Heating

Gas / Electricity / Hydrogen

Electrical supply

400 V, 50 Hz, 3-Phase

Max. temp. – heating zones

600 °C

Max. temp. – cooling zones

450 °C

Max. outlet temperature

200 °C

Cold-end coating (max.)

120 °C

Setpoint hold (empty)

600 °C

Staggered stacking

Yes

Cold-end coatings

Ready

Control System

HMI

Siemens IPC 477E 15"

PLC

CPU 1514SP

Lehr control SW

TIA Portal

Ethernet switch

SCALANCE XC208

Control cabinet

VX SE — standalone system

Cabinet AC unit

TOPTHERM BLUE E

Control cable length

Max. 20 m

Thermocouples

Dual Type K (stainless steel)

Certification

IEC / CE / UL

Ext. communication

TCP/IP, independent switch

Materials & Components

Belt material

Steel 0H18N9 (AISI 304)

Zone internal covers

Stainless steel 1.4301

Zone outer covers

Carbon steel

Insulation thickness

300 mm

Main motor

Siemens / Innomotics

Bearings

1 set SKF

Manuals

2× printed + 1× USB (EN)

Technical drawings

Yes (E-Plan)

Training

Yes

Excellence in every detail

Industrial Precision

thermostat

Precise Temperature Profile

Controlled gradual cooling with an automatically generated temperature profile eliminates internal stress and guarantees the strength of the final products.

bolt

Energy Efficiency

300 mm insulation and advanced TIA Portal control system optimise energy consumption while maintaining the precise temperature profile.

view_module

Modular Construction

Adjustable lehr length and capacity thanks to a modular approach — easy expansion without complete reinstallation.

Assembly Drawing

Assembly Drawing | Ref: AL-25-03-REV-01

Assembly Drawing Annealing Lehr

Start Technical Inquiry

Are you ready to modernise your production? Fill in our inquiry form and our engineers will prepare a feasibility study within 48 hours.

  • check_circleIndividual technical audit included
  • check_circleGlobal delivery and installation
  • check_circleIndustry 4.0 compliance verification